Pfizer had an existing water based heat recovery system and air handling unit servicing a large 24/7 manufacturing facility.
We worked with Pfizer to improve the efficiency and effectiveness of the AHU plant and ultimately reduce energy usage and running costs.
Our solution was to design an effective control strategy for the AHU plant. We developed and tested multiple strategies in order to find the best combination of control strategy and plant configuration.
global associates successfully delivered a 50% reduction in energy usage and costs, in addition to the reduced risk of plant failure.